Manufacture plants


Make the drinking water & soda, flavor water, lemon water & more types with urs brand name. 



Output : Electricity
Multi-fuel System 
Raw Material : Unsorted MSW, Biomass or any hydro carbon compound.
Rate Power Output : 1000KW
Overload power o/p : 1100Kw
Power load factor : 0.8

Land Area Required : 0.5 Acre


Loan Availability : 70%
Subsidy : 1 Cr. to 2Cr. (20% Higher for special state)
----------

Estimated Production per Annum : 8000 hours x 850 kw = 6800000 kwh /annum
T/F efficiency : 99%
Line Loss : 2%

----------
Lube oil consumption : 2g/kwh
---------
Sale of Electricity:
option1 : to State Government at higher tariff.
option2 : Fed into Grid or sell at base tariff and take benefit of REC.

1000Kwh or units =1 REC
price of 1 REC = 1500 to 4500 INR (tradable commodity at xchange )
----------------
Extra benefit of Carbon Credit.
---------------
By Product : Ash or activated carbon. (quantity depends on Raw material)

----------
Gas Engine used are air cooled.
----------

We also have lube oil circulation system that saves Lube oil and reduce consumption up to 50%.







                  Produce silver from home


Start highly profitable business of extracting pure Silver from easily available waste solution (known as fixer) of X-ray Clinics, Photo labs, Off-set processors, Block makers, Industrial X-ray department etc. using fully automatic machine, based on today's latest technology.


AN OPEN SECRET
Silver is a major cost component of photo films. Every film has a thin coating of silver over it. During image formation, silver separates from image portion of film and gets dissolved in fixing solution. By repeating the process again & again, fixer solution stops working some time due to presence of excessive silver and solution point comes, when ever silver concentration reaches up to 10 grams per liter. At This stage, exhausted fixer solution is rejected and used as basic raw material for our business. In order to recover pure silver, the waste fixer solution is filled in the plant and plant is connected with. The silver present in the solution is automatically separated off in solid metallic flakes from, which can be sold 'as it is' tp any jeweler, fetching a high profit. While purchasing fixer solution, the silver contents can be checked in advance with the help of silver estimation papers. According to that purchase price of waste solution can be settled and profitability may be predetermined. Therefore it is a totally riskless business.
SILENT FEATURES OF THIS TRADE
·         Silver Extraction Business is a risk-less trade as the profit may be predetermined at the time of purchasing raw material (waste fixer solution) with the help of Silver Estimation Papers.
·         A hard cash business, as the silver may be sold to jewelers in cash at current prevailing rates.
·         Raw material is easily available at low price at regular intervals.
·         Our Silver Extraction Plants are based on today's latest and the most economical technology, which no-one can compete.
·         All plants are automatic and this trade can be taken up as a part time business also.
·         No special training, industrial space, power/load line or license is required for this trade.
·         No labor is required for this trade, as manpower is involved only in the procurement of raw material (waste fixer solutions).
·         Completely safeguarded against any kind of electric shock.
·         It is not essential to attend the plant continuously while operating. Just start the process and your presence is required.
·         It is not essential to fill the plant tank completely. Plant can be operated with half tank or quarter tank filled with the fixer solution.
·         All models work on single phase domestic electricity line and consume low electricity.
·         No special permission is needed from any Govt. department to start this trade as silver extraction from waste material is exempted from excise and custom duty.
·         All plants are warranted for one year.
·         An opportunity to support the economy of the Nation.
·         Low investment, High returns.
PRESENCE OF SILVER
Silver is a major component of photo films. Every film, either X-ray or photographic has a thin coating of silver over it. During image formation, silver transfers from image portion of film and comes to the fixing solution. By repeating the process time and again, more and more silver keeps on dissolving in fixer solution, till it stops working due to presence of excessive silver (Attainment of saturation point) and is called the waste solution.This rejected waste fixer solution is the basic raw material for the business of extracting pure silver. The concentration of silver in fixer solution varies from process to process and time to time.
EXTRACTION PROCESS
Extraction of silver with our plants is an economical and safe process. Before procuring or processing fixer solution, the silver concentration can be checked with the help of silver estimation papers. Silver testing process is too simple that by dipping a small piece of silver estimation paperin the solution and comparing the change in colour with the accompanying colour chart, the silver concentration may be determined in grams per litre within a few seconds. On comparing with prevailing prices of siver, the purchase price of fixer can be settled accordingly. The operation of machine is a very simple process. By filling the waste solution into plant tank and connecting to the electricity mains, plant starts working and silver present in the solution starts depositing over the silver collecting blocks. After the stipulated time period, the whole silver present in the solution is extracted in the form of solid metallic flakes, which can be sold 'as it is ' to any jeweller at current rate of pure silver.
PROJECT FEASIBILITY
JKDN India are the first to introduce fully automatic silver extraction plants, based on today's latest technology, therefore extraction of silver has become more economical, safe and profitable. The best part of this trade is that silver contents can be checked before procuring the waste solutions with the help of silver estimation papers. It not only helps to predetermine the profitability but also reduces the risk-factor. The waste fixer is easily available from every X-ray clinic, photo lab, offset processor etc. at regular interval of around 10 days. In India the price of waste fixer is generally settled at approx half the rate of market value of silver present in it, but its rate may be vary. For example : X-ray fixer solution saturates when silver concentration reaches around 10 grams per litre (today's 10 gms. silver worth in India is Rs. 200-00 (i.e.5$ ) and it is available at the maximum rate of Rs. 80-00 (i.e.2$ ) per litre. Difference in the both the prices is your profit. The waste fixer solution may be available at much cheaper rates at you place, because its rate varies from place to place & time to time. Another interesting features of this plant is that, once the silver has been extracted properly from the waste X-ray fixer solution, this residual fixer may be reused by X-ray clinics again for fixing the X-ray films.
Silver Extraction Plants are available in various models. The most appropriate model can be selected according to the availability of raw material in your area and according to your working & financial capacity. Before selecting the suitable model, it is better to survey the market in your surrounding areas and get confirm from all X-ray clinics, photo lab etc. about availability of waste solution, changing period of fixer solution & its selling rate. It not only helps you to select the most appropriate model, but also gives the true picture about feasibility of this business.
SCOPE & DEMAND
With the development of science & technology and increasing population, the health facilities are developing very fast. Due to this reason the consumption of X-ray films as well as photo films are increasing. Along with it, quantum of waste fixer solution, generated by X-ray clinics, photo labs etc. are also increasing very rapidly. All the development shows that.
More Medical Facilities
More X-ray films
More Fixer
More Educational Activities
More offset films
More Fixer
More Tourism activities
More photo films
More Fixer
Hence all the more consumption of films means more availability of waste fixer solution. If the waste fixer solution is not being collected, then it would have to be thrown away resulting in waste of national resources. The overall availability of raw material will continue to increase in every part of the country and there will always be a good scope and demand for silver extraction.
PROJECT FEASIBILITY REPORT
To highlight the profitability and viability of this trade, a project report for Model SX-150 is available here. Kindly note that we have assumed the maximum rate for raw material (waste fixer solution), average silver concentration and lowest rate for sale of finished product (pure silver) in this report, to show the profitability on the lowest side. If you compare the current prevaling rates at your place, you will certainly find this project more profitable.




1.SILVER EXTRACTION PLANT MODEl : SSX - 150

Production Capacity
150 Grmas per day
Fixer requierment per day
15 Litres
Tank storage capacity
30 Liters
Electricity Load
100 Watts
Plant Dimension (in inches)
31 x 15 x 12 inches
Plant Shipping Weight (approx.)
25 kg

2.SILVER EXTRACTION PLANT MODEL : SSX - 250

Production Capacity
250 Grmas per day
Fixer requierment per day
25 Litres
Tank storage capacity
75 Liters
Electricity Load
150 Watts
Plant Dimension (in inches)
36 x 16 x 18 inches
Plant Shipping Weight (approx.)
35 kg

3.SILVER EXTRACTOIN PLANT MODEL : SSX - 300

Production Capacity
300 Grmas per day
Fixer requierment per day
30 Litres
Tank storage capacity
75 Liters
Electricity Load
200 Watts
Plant Dimension (in inches)
38 x 17 x 19 inches
Plant Shipping Weight (approx.)
40 kg

4. SILVER EXTRACTION PLANT MODEL : SRX - 1K

Production Capacity
1 Kg per day
Fixer requierment per day
100 Litres
Tank storage capacity
75 Litres
Electricity Load
300 Watts
Plant Dimension (in inches)
33 x 18 x 38 inches
Plant Shipping Weight (approx.)
70 kg

5. SILVER EXTRACTION PLANT MODEL : SRX - 2K

Production Capacity
2 Kg per day
Fixer requierment per day
200 Litres
Tank storage capacity
100 Litres
Electricity Load
500 Watts
Plant Dimension (in inches)
33 x 24 x 43 inches
Plant Shipping Weight (approx.)
100 kg

6. SILVER EXTRACTION PLANT MODEL : SRX - 3K

Production Capacity
3 Kg per day
Fixer requierment per day
300 Litres
Tank storage capacity
200 Litres
Electricity Load
600 Watts
Plant Dimension (in inches)
39 x 30 x 59 inches
Plant Shipping Weight (approx.)
125 kg

7. SILVER EXTRACTION PLANT MODEL : SRZ - 5K

Production Capacity
5 Kg Silver per day
Fixer requierment per day
500 Litres
Tank storage capacity
400 Litres
Electricity Load
750 Watts
Plant Dimension (in inches)
71 x 30 x 59 inches
Plant Shipping Weight (approx.)
175 kg
KINDLY NOTE THAT
- ALL MODELS OPERATE ON SINGLE PHASE DOMESTIC LINE 220 VOLTS A/C.
- PRODUCTION CAPACITY MENTIONED FOR COMPLETE 2 4 HOURS OPERATION WITH FULL TANK CAPACITY.
WE CAN PROVIDE THE DESIRED MODEL AS PER YOUR SPECIFIC REQUIREMENT IN ANY SILVER EXTRACTION CAPACITY OR SIZE. FOR PLANT AND OYHER IMFORMATION.


Project Report
To extract pure silver from used and waste fixer solution of X-ray clinics, Photolabs, Block makers, offset processors etc.
Base & Presumptions
While preparing this project report, it has been assumed that about 430 liters of waste fixer solution will be available from different sources, such as X-ray clinics, photolabs, offset processors etc. Generally one litre of fixer solution contains upto 10 grams silver. On safer side, its silver concentration has been assumed to be 7 grams/ litre. Silver extraction plant model SX-150 has been selected as the most appropriate model for handling 430 liters of waste fixer solution. The overall silver production should be 36 Kg. per annum. The working  days have been assumed to be 20 days in a month. Because plant can work continuously without the presence of operator / supervisor, therefore plant working has been calculated for 24 hours a day. Since the finished product silver is readily sellable in cash, it has been assumed that there will be sufficient raw material for 3 days to ensure the smooth running of this project.

Cost of project

Amount
(Indian Rupees)
1. Land & Building 

NIL
2. Plant & Machinery      

33,750-00
3. Initial Margin Money for working capital   

8,250-00
Total

42,000-00



Land & Building


The silver extraction plant model SX-150 is compact in size. A  small space (at home also) will be sufficient for its operation. Therefore, no special land & building is required for this trade. 

00-00



Plant & Machinery


Silver extraction plant model SX-150      

30,000-00
VAT/ Sales Tax @ 12.5%

3,750-00
Total

33,750-00



Other Fixed Assets


No other fixed assets are required  

00-00
RAW MATERIAL REQUIRED (PER MONTH)


430 litre fixer solution is required as basic raw material. Generally fixer solution contents
upto 10 grams per litre.On safer side, its average silver concentration has been assumed to
be 7 grams per litre. Because it is used and waste material and it remains available less than
Rs. 90-00 per litre, therefore its maximum rate has been taken to be Rs. 90-00 per litre (430 x 90)

38,700-00



Collection & Transportation charges


Because 430 litre  waste fixer solution can be precurred easily from nearby sources, therefore
collection charges hasbeen taken at the standard rate of Rs.15-00 per litre. (430 x 15)

6,450-00
Grand Total

45,150-00



Utilities Required (per Month)


Being 100 watt electricity load of plant, it will consume only2.4 x 20= 48
units per month .The electricity charges @ Rs. 5 per unit (48 x 5)

240-00
Total

240-00
Manpower required (per Month)


The silver extraction plant is automatic and single switch operated machine. The time
involved in this business is only in the procurement of waste solutions, which can be
done easily by the entrepreneur himself. Therefore no labour is required.

00-00



Overheads


A. Production overheads (per Annum)


1. Silver estimation paper, 2 cartoons @500-00

1,000-00
2. Misc. expenses for fixer solution collecting containers etc. 

4,000-00
Total

5,000-00
B. Administrative overheads (per Annum)


Printing & stationary, postage, account books maintenance & other expenses

2,400-00
Total

2,400-00
Working capital requirement


1. Raw material for 3 days including transportation charges

6,772-50 
2. Overhead s (containing testing paper etc.) in the beginning @ 20% 

1,480-00
Total

8,247-50
Say

8,250-00



Name of Asset       
Cost
Dep. Factor
Plant & Machinery
Rs. 33,750-00
13.68%


Total


Say

Dep. Amount 
4,410-45
4,410-45
4,500-00



Cost of production (per annum)


Rent for building

00-00
Raw material including transportation

5,41,800.00
Utilities

2,880-00
Wages and salaries

00-00
Production overheads

5,000-00
Administrative overheads

2,400-00
Interest @ 18%

7,560-00
Depriciation

4,500-00
Total

5,64,140-00
Sales Turnover


Total  silver extraction would be 36 kg. 120 gms. On safer it has been side,assumed to sales
proceeds of 36 Kg. silver per annum. The rate of silver fluctuates everyday, on the safer
side, its rate has been assumed Rs.22,000-00 per Kg. as the lowest rate of last six months.
Although today's silver rate is Rs . per Kg. (36 x 22,000) 

7,92,000.00 
Total

7,92,000.00 
Net profit (per Annum)


Sales Turnover

7,92,000.00
(-) Less cost of production

5,64,140.00
Net Profit

2,27,860.00



Net Profit per Month                     : 18,988-33


Net profit ratio                             : 28%


Return on investment                   : 542%





Break even point 


Fixed cost (per Annum)


Production overheads (50%)

2,500-00
Administrative overheads (50%)    

1,200-00
Depreciation

4,500-00
Interest

7,560-00
Total

15,760-00






B.E.P. =
FC x 100
=
15,760 x 100
FC + P.
15,760 + 2,27,860











Use:It extracts pure silver from waste fixer solution of X-ray clinics , photo labs, offset processors etc.and enable one to get extra income as a part time / full time business.

Sources of raw material:All used & waste fixer solution of X-ray clinic, photo labs offset film processors, block maker etc. situated in your nearby area. You yourself have to arrange for the raw material.

Silver content in fixer solution:Generally waste fixer solution contains up to 10 grams silver per liter.

Testing of solution:Fixer solution can be tested while purchasing and processing by means of silver estimation papers, which indicates silver contents present in grams per litre of solution. By dipping a piece of test paper in the solution for five seconds and comparing its colour with accompanying colour chart, quantity of silver can be estimated immediately.

Operation of plant:It is very simple to operate. By filling the waste fixer solution into the plant tank and connecting it to electricity mains (domestic line of 220 volts A.C.) , plant starts working and pure silver starts depositing over the silver collecting blocks in the form of solid metallic flakes. Detailed ‘Operation Manual is provided only along with the plant in which everything is mentioned clearly.

Installation:All the plants are portable , single switch operated and no foundation is required. Plant can be installed at home also because of being noiseless & pollution free.

Attendance during process:It is not essential to attend the plant continuously while operating. Just start the process and stop after it has processed completely as per stipulated time.

Sale of Silver:Silver can be sold ‘as it as’ to any jeweller at the current rate of pure silver. All jewllers happily accept to purchase silver in any bulk quantity and make the instant cash payment.


Processing Cost:Only 50 paise to maximum Rs.1.00 pre liter including electricity charges etc.


Silver Estimation paper:One cartoon of silver estimation paper contains 200 leavs & one colour chart and is sufficient for 1000 tests. It is not not available in loose form or sample form.


Transportation:Plants are compact in size and can be carried easily by bus, train. It can also be sent by road transport/ cargo service etc.


Electric Load:All plants works on domestic electricity line (220 volts AC) and its electric consumption is very low (from 100 W to 750 W only) e.g. model SX-150 works on 100 W. electricity load and consumes 1 unit in 10 hours working.


Pollution:There is no pollution due to extraction of silver through our plants.


Delivery: Immediately or within 30 days from the date of placement of order . It depends upon our current stock position.


Demonstration:Practical demonstration of plant is available at our office during working hours.


Govt. Permission:No special permission is needed from any govt. department to start this trade.


Loan:Bank can provide loan for this project. You have to contact your local bank directly. We do not give any loan / instalment or credit facility.


Project Report:We can provide project report for any model @ Rs.50-00 only.


Income Tax Relief:33.33% or as amended, depreciation is allowed to deduct from taxable income.


Branch Office:We do not have any branch office except here in Delhi.


List of Customers:It is not supplied by us because normally no-body wants to show his work place or allow any stranger to visit.


ICustomer Reference:Because of, plant is small in size & can be shifted any where according to easy availability of raw material or convenience of entrepreneur. Therefore we cannot provide costomer reference .


Maintenance & Servicing:All plants are quite sturdy to work for a long duration, without fear for giving any trouble and do not require any spare part / maintenance or servicing.


Consumable:There is no Consumable in our plant. All components in the plant, processing block etc. are permanent and (don’t require any replacement) Moreover, no chemical is required to be added during processing.


Warrantee:One year from the date of sale



Total Visitor Last one Days